Boldman Grade Project
This project is located on Lower Hogeye Road from mile post 0.0 to mile post 2.5. The road will be recycled-in-pace and widened, cement will be added for stabilization, and new pavement will be placed. Safety will be improved by the installation of new guardrail as needed.
Current Phase: Preliminary Design
Planned Construction: 2021
____________________________________________________________________________________________________
Vernon Smith Bridge Replacement

This project is located on Rose Gulch Road from mile post 0.0 to mile post 0.4. This project will replace the existing Vernon Smith Bridge and the approach roadway.
Current Phase: Preliminary Design
Planned Construction: 2020
_________________________________________________________________________________________________________
Starbuck Bridge Replacement

This project is located on Kellogg Hollow Road from mile post 13.0 to mile post 13.2. This project will replace the existing Starbuck Bridge and the approach roadway.
Current Phase: Preliminary Design
Planned Construction: 2020